What this work involves
Have the installer assess the available supply, cable route, mounting position and interaction with other equipment.
- Position and cable route
- Load management and use
- Controls and cost allocation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Position equipment and controls outside essential storage and circulation space.
Decide this before construction
Choose layout and storage needs before fixing window divisions. Then coordinate lighting and connection points with the remaining usable walls.
Allow for later maintenance
Keep window cleaning and controls accessible beside bespoke furniture. Retain drawings of removable parts so maintenance does not require unnecessary dismantling.
Cost factors for this service
Costs depend on connection work, excavation, charge point and electrical upgrades. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for ev charge points. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging ev charge points?
Shared parking also requires clarity about permission, management and cost allocation. These arrangements must suit the actual location.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.