What this work involves
Start with available height, subfloor and finish. Not every floor is suitable for cutting channels. Coordinate the system and controls for each room.
- Heat demand and source
- Floor suitability
- System and height
- Manifold, controls and routes
- Finish and commissioning
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Combine bespoke storage and finishes with space needed for screening.
What the drawing needs to explain
Draw fixed furniture, sightlines and opening windows together. Allow room for screening so it does not later obstruct cupboards, heaters or passages.
How to review the result
Check use with furniture, screening and doors in everyday positions. Assess daylight and the ability to screen the room in the evening.
Cost factors for this service
System, area, repairs and installation changes influence the price.
Bring this to the discussion
Plans, heat source, floor construction and finish preference.
Questions about the work
Is every floor suitable?
Structure, height, finish and heating demand must be compatible. The heating and flooring specialists should coordinate their requirements.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

